Check MS-2014-01657.tif ......... ... ... .. ..
return to B y' p
IDENTIAL CODE -
2009 INTERNATIONAL RES
CITY OF BLAIR REROOFING CHECKOFF SHEET
lair cit Hall rior to Final inspection
2'18 S 16" street, Blair, NE 68008
Because
of limitations caused by the infeasibility to'perform detailed inspections which would
inter with reroofing work, please indicate compliance with the following requirements
not
fol, lowing, this reroofing job.
Permit #� _ � �� 0 r �
i
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
� '1 �
roof covering comply with the requirements of the building code. (R 907. ) t
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
,
underla Ymeet or of a self-adhering polymer modified bitumen sheet was installed and
.
extends at least from the eayg' edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
L COMPONENTS ARE SOUND: The structural roof components are
[� STR.UCTURA d the material and equipment loads
. capable of supporting the roof covering onso� the and
covering system. (8907.2} '
that will be encountered during installati
S REMOVED: Existing roof covering was removed for one
(� EXIST1NG CO VERI N G wA
of the reasons required by section 8907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
i
shall be reconstructed in accordance
FLASHING INSTALLED PROPERLY Mashing at flashing to which
with approved manufacturer's installation instructions�� M
to installation. (8907.6}
inous materials are to be adhered shall be prim p rior
Si /aLry Prima installer
Date j
Date
Signature of Permit Holder '