Loading...
Check MS-2014-01629.tif f r C, S loom- vm� 2009 INTERNATIONAL f C i KES C ITY OF BLAIR R eturn to Blair City Hall' prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility fo'perform detailed inspections which d not interfere with reroofing work, please indicate co pliance with the following requirements following this reroofing job. Permit #: Installation Date: YES NO (� The materials and methods of application used for recovering or replacing the existing roof covering cornply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the wave's ed e to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) ® EXISTING COVERING 1111'AS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASH - ING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Primary Installer Date Date Signature of Permit Holder t G i