Loading...
Check MS-2014-01459.tif ' I 2009 INTERNATIONA R I I H O HEED` ITY OF BLAIR REROO Return o Bla Y ir C ity Hall•prior to Final inspection 21 B 16 to street, Blain, NB 00008 Because of limitations caused b the infeasibility to 'perform detailed inspections which would _ not Interfere terfere with reroofing work, please indicate compliance with the following requirements following this reroofing job Permit #: Installation Date. YES NO The materials and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (R907.1) (� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers 'of underla Y ment or of a self-adhering polymer modified bitumen sheet was installed and extends at least . from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of su orting the roof covering system and the material and equipment loads p pp that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVER1MO WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5) ASHiNO INSTALLED PROPERLY: dashing shall be reconstructed in accordance PL with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Sign to e of Primary Installer Date tgt nature of hermit Holder Date