Loading...
Check MS-2014-01389.tif INTERNA RESIDENTIAL CODE - G .. 2009 CITY OF LAIR RERO OFING CHECKOFF SHEET it City Hall 'prior to Final inspection Return to Bla . �� 1 Cain NE 68003 2'� 8 � 'C G street � Because of limitations Y caused b the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followin this reroofing job. , ® ZZ r - Permit #: Installation Dater YES NO The materials and m ethods of ap used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (R907J) i cE PRo rEcTiON INSTALLED: An ice barrier that consists of at least two layers 'of underla Y meet or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R90 .2..'!) G URAL COMPONENTS ARE S OUND: The structural roof components are C STRU T` capable ©f supporting the roof covering system and the material and equipment loads .. , that will be encountered during installation of the roof covering system. (R907.2 N ° EXISTIMA COVERING WAS RE1V OWED: Existing roof covering was removed for one of the reasons required by section 8907.3 ( NO RugTED METAL OR PLASHING= Existing vent flashing, metal edges, drain outlets, collars or metal counter-fleshing were not reinstalled if rusted. (R907.5) ING INSTALLED PROPERLY: dashing shall be reconstructed in accordance I LA S H Metal flashing to which with approved manufacturer's installation instructions. bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Si 9 nature 1af Primary installer Data . n e of Permit Holder Date S gnatur i