Check MS-2014-00964.tif i
i
i
I
08/05/2014 07:17 FAX a 001
JU1. 30. 2014 10,28AM CITY OF BLAIR (402, 426, 4191 ) No. 4493 P. 1
2,009- c
INTER NATIONAL RE CODE -
CITY OF BLAIR REROOFING +CHECKOFF SHEET
Return to Blain City Halfprlor t Final Inspection 11,1
�� i
218 8 1 Street, Blair, N E 68008 F
Sacause of 11m1tatlone caused by fh* Infeasibility to 'Perform datalled lnepeatlone which would
jqAo Interfere with reroofing work, please Indlosto oompliAnce with ate following requirements
woq, this farat�'Mg f .
Permit a: o
installs "ttcn Date,
YES NO
C The materi and methods of application used for r+ecoVe or replacing the Wdsting
roof covering comply Wth the requIroments of the building code, (i OD7.t)
icrq P ' - 'lr CT,JQ NgtA Ate lam► banter that vor�c( #a of at leas two layers of
underletymstht or of a +pelf- adherIng polymer modifist bitu theetz3v luAtall a and
extends a, t iped[w .1 I ton point jA (east ?A Ins the exterior
wail line Qf the building. (R905.2.7.j)
)Q AIRUZU,_,_& 90MO TS A139 ffD, 'Tho s #ructwal roof components are
capable df sUpporling the roof covering system and the materiel and equipment load$
` y that will be encounterod during Installaklon of the roof oovering systern. (R807.2)
EXISTING CoVP.0.11 0 agidOaD: Existing roof covering was removed for one
of the reasons req ulred by ssctlan 11901.3
JL0 NEW MEMM & .VING, Uating vent flashing, metal edges, drain
outleta, odliars or me i countor flesh{ng were not reinstalled If rusted. (11807.5)
y l+L . SIitN l ►,jN8 j i. JD p &gPEj!L ;. Flashing shall be recormtruc#ed In accordance
!"
. with approved rnanuofurers i nstallation instruottona. Nlatai fleshing to w hloh
bituminous materiels are to be adhered shall be primed prior to Installation. (11907.e)
,r
a f' Pr t`rtary Instmiler Rafe
tgna ein t Noldar �— - Date �... ,