Loading...
Check MS-2014-00886.tif 20 09 INT CITY F BLAIR R ER O O F ING CHECKOFF SHEET w Return to Blair City Hall prior to Fi inspection 218 S 1 6 t " Street, Blair, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which d not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #. Installation Date: YES O The materials and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (R907.1) Me ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was Installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ' . ' I' Q STRUCTURAL COMPONENTS ARE SOUND. The structural roof comp onents are capable of supporting the roof covering system and the material and equipment loads ., that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 I 4 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) f FL SHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance A wrove materials manufacturer's installation instructions. Metal flashing to which are to be adhered shall be primed prior to installation. (R907.6) i Si nature of Primary installer Date g , Date g Si ria re of Permit Holder