CITY OF LAIR REROOFING FIB H FF SHEIEWTS
Return to Blair Ci H all prior t o Final Inspect
18 6 i6th S treet, Bair, HE 68008
Becauso of limitations caused by they infeasibility to'perform detailed Inspections which would
Dot inteffore with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit ##:
P
Installation Date: it t
YES No
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICF, PROTECTION INSTALLED: Are ice barrier that consists of at least two layers Of
modified bitLi men sleet was ins talled and
underlay�mor�t or of a self - adhering p
extends least frog th% ggyt! � to a point at least 24.inchW the exterior
wall lino of the building, (FM6.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
ti that will be encountered during instailaflon of the roof covering systen'. (RO07• )
EXISTI140 C0Vg RlNQ WAS Rl=ltt OVl D: Existing roof covering was removed for one
s req uired b section 8907.3
of the reason � Y
NCB RUSTED MET OR ELASMING rxisting vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted, (R!907,5)
FLA HINQ INSTALLED PROPER Flashing shall be reconstructed in accordance
with approved manufacturer's installation lnstructions. Metal flashing to which
biturninoUS Maprials are to be adhered shall be primed prig to installation. (t gg7.6�