Loading...
Check MS-2014-00785.tif f ff kk 2 009 INTERNATI RESIDENTIAL C ODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection M S'16 Street, Blair, NE 65008 f I Because of limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing jo � Permit #: Installation Date: YES NO (� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i (� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building, (R905.2.7.1) STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof cov ering y erin system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2} (� EXIST LNG COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) d FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) - 7 Signature o rimary Installer Date Date nature of Permit Holder Sig i i