Check MS-2014-00784.tif }
INTE NATIONA L RESIDENTI L C 2 009 C
CITY OF BLAIR REROOFING CHECKOFF SKEET
Return to Blair City Hall'prior to Final inspection
2'18 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followin , this reroofing job. 00 7
Permit #:
Installation Date:
YE NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION 1NSTAlLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL. COIItIPONENTS ARE SOUND: The structural roof components are
` covering s
capable of supporting the roof. g stem and the material and equipment loads y
that will be encountered during Installation of the roof covering system. (R907.2)
STING COVERIN, G WAS REMOVED: Existing roof covering was removed for one
EXl
of the reasons required by section R907.3
(� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets,
collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
. E
E
I
Signature of Primary Installer Date
ignature of Permit Holder
Date