Loading...
Check MS-2014-00784.tif } INTE NATIONA L RESIDENTI L C 2 009 C CITY OF BLAIR REROOFING CHECKOFF SKEET Return to Blair City Hall'prior to Final inspection 2'18 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followin , this reroofing job. 00 ­7 Permit #: Installation Date: YE NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION 1NSTAlLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL. COIItIPONENTS ARE SOUND: The structural roof components are ` covering s capable of supporting the roof. g stem and the material and equipment loads y that will be encountered during Installation of the roof covering system. (R907.2) STING COVERIN, G WAS REMOVED: Existing roof covering was removed for one EXl of the reasons required by section R907.3 (� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) . E E I Signature of Primary Installer Date ignature of Permit Holder Date