Loading...
Check MS-2014-00670.tif C i j � k • 4 F 2009 INTERNATIONAL RESIDENTIAL CODE I CIT OF BLAIR Return to Blair city Hall* prior to Final Inspection 18 S 16 " Street, Blair, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: Installation Date: YES , NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the budding code. (R907.1) INST PROTECTI ON ALLED: An ice barrier that consists of at least two layers of ICE underlayment or of aself- adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building, (R905.2,7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EX 1STING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which 'nous m to be adhered shall be primed prior to installation. (8907.6) C Sig ure Installer Date Date Signature of Permit Holder