Loading...
Check MS-2014-00532.tif i c I l CHECKO 2009 INTERNATIONAL RESIDENTIAL CODE - CITY OF BLAIR REROOFING Return to Blair City Hau' prior to Final Inspection. 21 s s I all street, Blair, NE 68008 Because of iimitations caused by the infeasibility,to•perform detailed inspections which Would not interfere with reroofing work, please indicate compliance with the following requirements foll6wing this reroofing job. Permit t 2 Installation Hate' I YES NO The materials and methods of application used fo recovering or replacing the existing roof covering cornply with the requirements of'the huilding code. {RS07.9} ICE pRo" EGTIoU INSTALL Eli3; An ice barrier that consis of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends 'at least from the eaveys ed e to a point at least 24 inches inside the exterior gall line of the building. (R905,21A) S�"RUCTURAL CQIAPONENTiS ARE SOUND: The structural roof components are capable of supporting td roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (890 r-X i - c,-T1MC- - , COVERING WAS RF-MO QED: Existing roof covering was removed for one " azons req uired b section 8.007.3 of the re a y No DUSTED METAL OR FLASHING= Existing vent flashing, metal edges, drain ' ouilets, ooElars ar metal counter flashing were not reinstalled if rusted. (8907.5) PzASHIhIG 11 STAl.�LED PROPERLY; Plashing shall be reconstructed in accordance with approved rnanufacturees installation instructions. Metal flashing to whic bituminous materials are to be adhered shalt be primed prior to install (R!907.6) ta *D a Signature of Primary Installer Q to -- Date Signature of Permit Holder i, e90: i- i, t i, 90 onv