Check MS-2014-00532.tif i
c
I
l
CHECKO 2009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF BLAIR REROOFING
Return to Blair City Hau' prior to Final Inspection.
21 s s I all street, Blair, NE 68008
Because of iimitations caused by the infeasibility,to•perform detailed inspections which Would
not interfere with reroofing work, please indicate compliance with the following requirements
foll6wing this reroofing job.
Permit t
2
Installation Hate'
I
YES NO
The materials and methods of application used fo recovering or replacing the existing
roof covering cornply with the requirements of'the huilding code. {RS07.9}
ICE pRo" EGTIoU INSTALL Eli3; An ice barrier that consis of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends 'at least from the eaveys ed e to a point at least 24 inches inside the exterior
gall line of the building. (R905,21A)
S�"RUCTURAL CQIAPONENTiS ARE SOUND: The structural roof components are
capable of supporting td roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system, (890
r-X i - c,-T1MC- - , COVERING WAS RF-MO QED: Existing roof covering was removed for one
" azons req uired b section 8.007.3
of the re a y
No DUSTED METAL OR FLASHING= Existing vent flashing, metal edges, drain '
ouilets, ooElars ar metal counter flashing were not reinstalled if rusted. (8907.5)
PzASHIhIG 11 STAl.�LED PROPERLY; Plashing shall be reconstructed in accordance
with approved rnanufacturees installation instructions. Metal flashing to whic
bituminous materials are to be adhered shalt be primed prior to install (R!907.6) ta
*D a Signature of Primary Installer
Q to
-- Date
Signature of Permit Holder
i, e90: i- i, t i, 90 onv