Check MS-2014-01569.tif F
,AT I O N,AL RESIDEN 200 rN�R�N _
CITY OF BLAIR REROOFING CHECKOFF SHEET
t
Return t o Blair Cit y Hall* prior to Final Inspection
�
2'1 S S t h Strew, Blair, NE 660 08
Because of limitations caused by the infeasibility to 'perform detailed inspections which would
not interf ith reroofing work, please indicate compliance with the following requirements
r e g
followin this reroofing job.
Permit #:
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
�
roof covering comply with the requirements of the building code. (R907.1)
lCE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underla ment or of a
self polymer modified bitumen sheet was installed and
y
extends at least from the eaye's edge to a point the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof g y
covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
� EXISTING COVE
RING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
[� NO RUSTED 11t1ETAL OR PLASHING: Existing vent flashing, metal edges, drain
counter-flashing were not reinstalled if rusted. (R907.6)
outlets, collars or metal c g
P
LASHING INSTALLED PROPERLY: Flashing shell be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature of Primary Installer Date
g r
Sig a of Permit Holder
Daf
f
i