833 (2).tif i
07- 23 -'14 15;19 FAO]- Absolute Customs T -038 P0004/0004 F -074
2009 INTERNATIONAL RES CO
CITY OF AID. REROOFING E KOFF SHEET
Return to wair c i ty Hall prier t o Final Inspection
2 1 8S 1 6 th S treet, Blair, NE 68008
1390ause of limitations caused by the Infeasibility to'perform detadled Inspections which would
Mot interFere with reroofing work please Indicate comp lance with t'he following requirements
allowing this reroofing job.
installati Date: ,/ J ' V
YES NO
The material$ and methods of appllcaticn used for recovering or replacing the existing
roof covering comply with the requirements of the building code, (11907.1)
ICE PROTECTION IN ALLEA: An ice barrier that consists of of least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was stalled and
extends t least from the eave's edge to a point at l� 4 Inc es inside the exterior
wall lime of the building. (R905,2.7.1)
STRUCTURAL cpMPONENTS ARV, SOUND: The structural roof c rnponents a
capable of supporting the roof covering system and the material and equipment l oads
that will be encountered during Installation of the roof covering system. (11907.2)
}tISTIN C� ' 14G WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
C3 f40 RUS"TEt� METAL OR pL.A I - 1 NFL Existing vent flashing, metal edges, drain
outlets, collars or Metal counter were not reinstalled if rusted, (8907 +6)
C3 F4A514ING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prier to installation. (R907.6)
signature of Primary installer ate
Q q 11 In — .4
1gnature of rmit Ho der '
c
i
t