1458.tif i
2 009 INTER R
CITY OF BLAIR RER CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection ,
21 S 16 street, Blair, NE 6600$
io s caused b the infeasibility to'perform detailed inspections which Mould
Because of limitations Y
not interfere with reroofing work, please indicate compliance with the following requirements
following, this reroofing job. p
Pe rmit 4: " ItJJ
2L
Installation Date. _ �- ---
YES O
' d methods of application used for recovering or replacing the existing
The materials an p
roof covering comply with the requirements of the building code. (R907.1)
�
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers 'of
underla Y meet or of a self-adhering polymer modified bitumen sheet was installed and
ends at least from the eaye's edge to a point at leash inches inside the exterior
wall line of the building. (R905.2.7.1)
RAL COMPONENTS ARE SOUND: The structural roof components are
STRI(
capable of supporting the roof covering system and the material and equipment loads
hat will be encountered during installation of the roof covering system. (R907.2
(� ED: Existing roof covering was removed for one
EXISTI
NG C01fERIl�G WAS RElviaV
of the reasons required by section R907.3
NQ RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
ASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
t ° Metal flashing to which
with approved manufacturer's installation instructions.
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
L0 L12 /'9
Signature f Primary In tiller pate
r e,
Date
Signat re of Permit Holder