Loading...
1458.tif i 2 009 INTER R CITY OF BLAIR RER CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection , 21 S 16 street, Blair, NE 6600$ io s caused b the infeasibility to'perform detailed inspections which Mould Because of limitations Y not interfere with reroofing work, please indicate compliance with the following requirements following, this reroofing job. p Pe rmit 4: " ItJJ 2L Installation Date. _ �- --- YES O ' d methods of application used for recovering or replacing the existing The materials an p roof covering comply with the requirements of the building code. (R907.1) � ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers 'of underla Y meet or of a self-adhering polymer modified bitumen sheet was installed and ends at least from the eaye's edge to a point at leash inches inside the exterior wall line of the building. (R905.2.7.1) RAL COMPONENTS ARE SOUND: The structural roof components are STRI( capable of supporting the roof covering system and the material and equipment loads hat will be encountered during installation of the roof covering system. (R907.2 (� ED: Existing roof covering was removed for one EXISTI NG C01fERIl�G WAS RElviaV of the reasons required by section R907.3 NQ RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) ASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance t ° Metal flashing to which with approved manufacturer's installation instructions. bituminous materials are to be adhered shall be primed prior to installation. (R907.6) L0 L12 /'9 Signature f Primary In tiller pate r e, Date Signat re of Permit Holder