Loading...
1435 (3).tif ' f 2009 INTERNATIONAL RESIDENTIAL CODE - QTY OF BLAIR REROO FING CHECKOFF SHE Return to Blair City it y Hall'prior to Final inspection 218S16 Street, Blair, NB 884 08 t Because of limitations Y ions caused b the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: installation Date. ES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's ed e to a point at least 24 inches inside the exterior wall line of the building. (R905.2,7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are stem and the material and equipment loads s capable of supporting the roof covering y that will be encountered during installation of the roof covering system. (R907.2) S ING IN . G WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 (� NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) PLASH ING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) nature of Primary installer Dale w _ ' Date nature of Permit Holder