1435 (3).tif ' f
2009 INTERNATIONAL RESIDENTIAL CODE -
QTY OF BLAIR REROO FING CHECKOFF SHE
Return to Blair City it y Hall'prior to Final inspection
218S16 Street, Blair, NB 884 08 t
Because of limitations Y ions caused b the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #:
installation Date.
ES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's ed e to a point at least 24 inches inside the exterior
wall line of the building. (R905.2,7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
stem and the material and equipment loads
s
capable of supporting the roof covering y
that will be encountered during installation of the roof covering system. (R907.2)
S ING
IN
. G WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
(� NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
PLASH
ING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
nature of Primary installer
Dale
w _
'
Date
nature of Permit Holder