Loading...
1403.tif 2 009 INTERNA TIONAL RESID CITY OF BLAIR RER OOFING CHECKOFF SHEET Return to Blair city Hall•prior to Final Inspection 218S 16 street, glair, NE 6800 E Because of limi a t •dons caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements follovincl this reroofing job. f W b Permit #. Installation Date: F 12- � YES NO The materials and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (R907A) � ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers 'of underla meet or of a self adhering polymer modified bitumen sheet was installed and Y extends at (east from the eaye's edge to a point at least 2� inches inside the exterior wall line of the building. (R905.2.7.1) STRU G T URA coMPONENTS ARE SOUND: The structural roof components are C� able of supporting the roof covering system and the material and equipment loads capable Ply that will be encountered during installation of the roof covering system. (R907.2) E IS VAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO R US TEp METAL, OR FLASHINCx Existing vent flashing, metal edges, drain [� outlets, collars or metal counter were not reinstalled if rusted. (R907.5) PL.ASHIN II�ISTAI -LE© PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. {R907.G q Signature of Primary Installer Da Si nature of hermit Holder Date g I