1387.tif 2009 INTERNATIONAL RESIDENTIAL CODE -
C ITY LAl
Return to
lair City Hall r�iori~ to Final Inspection
�h
2'1 S i 6 street. B lair, NE 68008
't tions caused b the infeasibility to'perform detailed inspections which would
Because of limitations Y
not interfere with reroofing work, please indicate compliance with the following requirements
followin this reroofing jobs
Permit 0:
Installation Date:
YES MD
The materials and methods of application used for recovering or replacing the existing
�
roof covering comply with the requirements of the building code. (R907A)
OTBOTIgN INSTALLED. An ice barrier that consists of at least two layers 'of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 2� inches inside the exterior
wall line of the building. (8905.2.7.1)
STRUGTU COMPOMTS ARE SOUND: The structural roof components are
P
ca able of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907,2)
N • •
ExISTlmO OO VERNO WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
��A E
No RUgTED METAL OR PLASHIt�. Existing vent flashing, metal edges, drain
outlets, collars or metal counter flashing were not reinstalled if rusted. (8.907.5)
Sri. I.ASHiIttO INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
P
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Date
Signature of Primary Installer Da
Signature of Permit Holder Date