Loading...
1387.tif 2009 INTERNATIONAL RESIDENTIAL CODE - C ITY LAl Return to lair City Hall r�iori~ to Final Inspection �h 2'1 S i 6 street. B lair, NE 68008 't tions caused b the infeasibility to'perform detailed inspections which would Because of limitations Y not interfere with reroofing work, please indicate compliance with the following requirements followin this reroofing jobs Permit 0: Installation Date: YES MD The materials and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (R907A) OTBOTIgN INSTALLED. An ice barrier that consists of at least two layers 'of underlayment or of a self adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 2� inches inside the exterior wall line of the building. (8905.2.7.1) STRUGTU COMPOMTS ARE SOUND: The structural roof components are P ca able of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907,2) N • • ExISTlmO OO VERNO WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ��A E No RUgTED METAL OR PLASHIt�. Existing vent flashing, metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (8.907.5) Sri. I.ASHiIttO INSTALLED PROPERLY: Flashing shall be reconstructed in accordance P with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Date Signature of Primary Installer Da Signature of Permit Holder Date