1381.tif 2009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF BLAIR REROOF
R eturn to Blair City Hall prior to Final Inspection
21 s 1 6th street, Bla NE 68 00 $ G
k
S
E
caused b the infeasibility to'perform detailed inspections which would
Because of limitations y �
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing jobs
Permit:
Installation Dater `?
YES NO
The materials and methods of application used for recovering or replacing the existing
� ri
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTB G �` l_0U INSTALLED: An ice barrier that consists of at least two layers 'of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a paint at least 2A4 inches inside the exterior
wall line of the building. (8905.23.1)
sTRUGTURAb. col1IPONENTs ARE SOUND' The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
h coverin s ystem. 8907.2)
that will be encountered during installation of the ro o f g y
w
ExI S�INO O a ERINO vVAS REMOVED: Existing roof'covering was removed for one
� ,
of the reasons required by section 8907.3
[� NO RUSTED METAL OR F ASHII .- Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.0)
PLASHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Z2),
Signature of Primary Installer Date
Signature of Permit Holder Date