Loading...
1337.tif I 200 RESIDENTI CITY OF . BLAIR RE ROOFING CHECKOFF SHEET to Blair City all prior to Phial Inspection . Return * t � S 2'1 1 6th Street,. Blair, NE 6800 Because of l caused b the infeasibility to , perform detailed inspections which would not in terf er e _' e with reroofing work, please indicate compliance with the Following requirements w g fo llowing this reroofing job. . )-w � Perm #. � . E Installation Dater YES NO The materials and methods of application used for recovering or replacing the existing � ri roof covering comply with the requirements of the building code. (R907.1) ICI~ pROTBCTION INSTALLED: An ice barrier that consists of at least tw layers 'of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at asf from the eaye's edge to a point inches inside the exterior wall line of the building. (R905.2.7.1) S RUCTURAL. Gor IPONENTS ARE SOUND: The structural roof components are system and the material and equipment loads capable of supporting the roof covering y • ...; that will be encountered during installation of the roof covering system. (8907.2) j� >sIs VA REM Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTBD METAL OR FLASHNC: Existing vent flashing, metal edges, drain o , utlets collars or metal counter-flashing were not reinstalled if rusted. (R907.5) ELASI- iZI�IO il`�STA�.LBD p aPBRLY: leashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Date Signature of Primary Installer .', ` J , e Date Signature of Permit Holder