1337.tif I
200
RESIDENTI
CITY OF . BLAIR RE ROOFING CHECKOFF SHEET
to Blair City all prior to Phial Inspection .
Return * t � S
2'1 1 6th Street,. Blair, NE 6800
Because of l caused b the infeasibility to , perform detailed inspections which would
not in terf er e _' e with reroofing work, please indicate compliance with the Following requirements
w g
fo llowing this reroofing job.
. )-w �
Perm #. � .
E
Installation Dater
YES NO
The materials and methods of application used for recovering or replacing the existing
� ri
roof covering comply with the requirements of the building code. (R907.1)
ICI~ pROTBCTION INSTALLED: An ice barrier that consists of at least tw layers 'of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at asf from the eaye's edge to a point inches inside the exterior
wall line of the building. (R905.2.7.1)
S RUCTURAL. Gor IPONENTS ARE SOUND: The structural roof components are
system and the material and equipment loads
capable of supporting the roof covering y
• ...; that will be encountered during installation of the roof covering system. (8907.2)
j� >sIs VA REM Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTBD METAL OR FLASHNC: Existing vent flashing, metal edges, drain
o ,
utlets collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
ELASI- iZI�IO il`�STA�.LBD p aPBRLY: leashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Date
Signature of Primary Installer
.', ` J , e
Date
Signature of Permit Holder