Loading...
1311.tif i I f 07- 23 -'14 15 :19 FROM- Absolute Customs T -038 P0003/0O04 F -074 10" "L f i 2009 INTER RESIDEN CFF HT CITY OF BLAIR REROOFING Return to Blair City Hall prior to Fine inspection 218 S 16 Street, Slair, NE 68008 Because of 11mitations caused by the infeasibliity to porform detailed inallse ions which uvould not Interfere with reroofing work, pleaso indicate► coXmplianco with the following r equirements follvw.ing, this reroofing job, Permit #: Installation Date; .�.� ` ' '•-��' YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) i ICS PIRCTEDTION INSTALL50: An ice harrier that consist$ of at lust. WO layers of r uriderlaymerif or o f � p oly mer a self adherin of mer m odified bitu sheet was installed and extends at least from tl,e eave'e ed e to a paint of least 4 i ches 'ns'de the exterior wall litre of the building. (R905.2.7.1) STRU0 - f URAL. DOiillPt7NE TS AR SS0UM13: - rho structural roof coMpanente are equipment . capable of supporting fife roof r.,overing systarr7 and th e material and loads .. that will be encountered during installation of the roof covering Syst8111. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof cover was removed for one of the reasons required by section R907..3 ( NO RUSTED li 5TAL Old FLASHING: P_�cleting vetit flashing, metal edges, drain .outlets, collars or metal counter - flashing were not re insta lled if rusted. (8907.6) q) C1 FLASHIN l STALLED P11MRLY: Flashing shall be reconstructed in acoordance with approved marrufa cturees installetion instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) I P11 I // _ w ature of Primary In ate Lure of P - mit Holder bate f i