1311.tif i
I
f
07- 23 -'14 15 :19 FROM- Absolute Customs T -038 P0003/0O04 F -074
10" "L f
i
2009 INTER
RESIDEN
CFF HT
CITY OF BLAIR REROOFING
Return to Blair City Hall prior to Fine inspection
218 S 16 Street, Slair, NE 68008
Because of 11mitations caused by the infeasibliity to porform detailed inallse ions which uvould
not Interfere with reroofing work, pleaso indicate► coXmplianco with the following r equirements
follvw.ing, this reroofing job,
Permit #:
Installation Date; .�.� ` ' '•-��'
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (11907.1)
i ICS PIRCTEDTION INSTALL50: An ice harrier that consist$ of at lust. WO layers of
r
uriderlaymerif or o f � p oly mer a self adherin of mer m odified bitu sheet was installed and
extends at least from tl,e eave'e ed e to a paint of least 4 i ches 'ns'de the exterior
wall litre of the building. (R905.2.7.1)
STRU0 - f URAL. DOiillPt7NE TS AR SS0UM13: - rho structural roof coMpanente are
equipment . capable of supporting fife roof r.,overing systarr7 and th e material and loads
.. that will be encountered during installation of the roof covering Syst8111. (8907.2)
EXISTING COVERING WAS REMOVED: Existing roof cover was removed for one
of the reasons required by section R907..3
(
NO RUSTED li 5TAL Old FLASHING: P_�cleting vetit flashing, metal edges, drain
.outlets, collars or metal counter - flashing were not re insta lled if rusted. (8907.6)
q) C1 FLASHIN l STALLED P11MRLY: Flashing shall be reconstructed in acoordance
with approved marrufa cturees installetion instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6) I
P11 I // _
w
ature of Primary In ate
Lure of P - mit Holder bate
f
i