Loading...
1305.tif I 07-23-'14 15 :19 FROG- Absolute Customs T -038 P0002/0004 F -074 D Fm 2009 INTERNATIONAL RESIDENTIAL CO t: C ITY OF B LAIR REROOFING CHECKOFF S H EET Return 0 Blair City Hall prier to Fi nal inspection : 2188 1G Street, Blair, NE 68008 l3eoause of U nitstions caused by the Infeasibility tO porform detailed inspoations which Wo interf+re with reroofing work, pleases indicate comPlia.nce With flee fa11 VIng ! equtrem following this reroofing job. Permit#:— Installation Date: YES No The materials and methods of appli used for reco vering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION, INSTALLED: An ice barrier that consists of at least two layers of uriderlayment or of a self polymer modified bitumen sh �va� installed and extends at least from the �:ave's edg to a point at least �4 inc es i - �sid� the exterior wall line of the building, (8905,2.7.1) STRUgTURAL COMPONENTS ARE SOUND: The sttuctural roof components are capable of supporting thO roof covering system and the material and equipment loads .. that will be encoontered during installation of the roof covering system. (R9O7.2) rmSTING C9YERING WNS REIiII9V 5D Existing roof covering was removed for one of the reasons required by s eGtion R907. NO RUST14 NEVI~ OR FLASHING: Existing vent flashing, metal edges, drain count er - flashing not reinstalled if rusted. (11901.6) outlets, collars or metal �couttt g were ` Ft.A ►k11N 1N Tla►LE._ P OP'ERLy. Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous m9A0rials are to be adhered shall be primed prior to installation. (8907.0) s ' L4 Signature of Primary installer Date .- gna -1-- 4iture of It >46ider Date i