2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLA1R. REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
216 S 16 Street, flair, NE 68006
Because of limitations caused by the infeasibility to perform detailed inspections which would
of interfere with reroofing work, please indicate compliance with the fallowing requirements
following this reroofing job.
Permit #:
Installation Date: -
Y N
The materials and methods of application used ,for recovering or replacing the existing E
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building (R905.2.7.1)
STRUCTU COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVE RING WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's, installation instructions. Metal flashing to which
bituminous aterials are to be adhered shall be primed prior to installation. (R907.6)