Loading...
1217.tif t k 2009 INTERNATIONAL RES C ITY OF BLAIR I CHECKOF SHEET I Return to Blair City Hall prior to Final Inspection 218S 16�' Street, Blair, HE 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing work, please Indicate compliance with the following requirements following this reroofing job. permit #: , 201 n Installation Date. (4- r YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ® ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed extends at least from the eave's ed a to a point at least 24] nches inside the exfi r wall line of the building. (8905.2.7.1) ( STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads • ..; that will be encountered during installation of the roof covering system. (8907.2) ❑ EXISTING COVERING jA AS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain were not reinstalled if rusted. (11907.5) , outlets, collars or metal counter-flashing i i ❑ FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance ' in stallat io n i with approved manufacturer's �nstallat�on structions. Metal flashing to which in bituminous materials are to be adhered shall be primed prior to installation. (11947.6) Sig ature of Primary installer Date Date Si nature of Permit Holder , i I