Loading...
1177.tif f Ju1.23.2014 06:06 PM PAPILLION WINDOWS & SIDIN 4025971777 PAGE. 3/ 3 2009 INTEKNA k l RE'S CITY OF . BLAIR REROOFIN r Return to Lair city Ma ll' prior t Final 1nspectt . 1 Wh Street,, Blair, NE 6800 600ause of ►imitations oausod by the infeasibility to , porform detailed inspections which would not 4nt rfere wlth reroofing work, please indicate compliance with the following requirements fob of d r this reroofing jobo ` ?� o n Permit Mr Installation bate' 140 The materials and methods of application used for recovering or replacing the existing roof cov$ring comply with the requir$ments of the building code. (R907.1) Dig 0 EDTION, { STALLED An toe barrier that consists of at lust W layers df modified bitumen $heet as i pile and underlayment or of � self-adhering poly east ino es 1 de the exterior extends at le t fro t e eaves ed a to a point at 1 wall lire of tho building. (R905.2.1.1) STRUDTi,fRAL COMPONENTS ARE SOUND'. The structurol roof components are I capable cif supporting the roof covering system and the m ter{ {and equipment loads r that will be encountered during installation of the roof Covering system. (R907,2) )5X 8TlNa COVERING WA.8 REtVIQ► FD- E- Asting roof covering was removed for one of the re aeons required by oeotion 8007.3 _Na U l�D �T'AL OR FLASHING: Existing vent f[ashing, metal edges, drain outists, collars or metal counter-flashing wore not reinstalled if rusted. (R907,6 CHI 1 T LLED P l R : dashing shall be reoonetructed In accordance with approved manufacfurcr's instaiNtlon instruotions. Metal flashing to which bituminous matorials are to be adhered shall be primed prior to Installation (R907,6) D at -Signatur of Prima In tali+ lg Law re of Permit Molder Date f t