CITY OF BLAIR REROOFING C HEC�t��� SHEET
Return to Blair city Half to Final Inspection e
218 '16 Street, Blair, NE 68008
Because of limitations caused b the infeasibility ta'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following. this reroofing job.
Permit
Install Date:
install .
YES NO
The materials and methods of application used for recovering or replacing the existing
�
roof covering comply with the requirements of the building code. (R907.1)
i
�j ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer of mer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL. cOMPONENTS ARE SOUND: The structural roof components are
Y
capable of supporting the roof
covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
lN0 COVERING WAS REMOVED: Existing roof`covering was removed for one
EXIST � 907.3
of the reasons required by section R
LISTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
�. FLASH[N
G INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Meta flashing towontc 8907.6
bituminous materials are to be adhered shall be primed prior to installa l i ( )
Signature of Primary Installer Date
f' Dat
- § ; 1g r4atCWe of Permit Hold