1138.tif i
RESIDENTIAL CODE
2009 IN TERNATI ONAL
CITY OF BLAIR REROOFING CHECKOFF SHEET
to Blair City all prior to Final Inspection
,
Retu � th y
21 8 S 16 Street, Blain NE 68 008
Because of limitations used b the infeasibility to *perform detailed inspections which would
�mitattons ca y
not interfere with reroofing work, please indicate compliance with the following requirements
following , this reroofing job.
Permit #:
Installation Date.
YES NO
The materials and methods of application used for recovering or replacing the existing
�
roof covering comply with the requirements of the building code. (R907.1)
IC E PR OTECTION INSTALLED: An ice barrier that consists of at least two layers of
I�
underla y meet or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's ed a to a point at least 24 inches inside the exterior
wall line of the building. (R905.23.1)
C� STRUCT
URAL COMPONENTS ARE SOUND. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
• that will be encountered during installation of the roof covering system. (R907.2
EXISTING COVER
ING WAS REMOVED: Existing rootcovering was removed for one
• of the reasons required by section R907.3
USTED METAL OR PLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
PL
ASHING INSTALLED PROPERLY; Plashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which 907
bituminous materials are to be adhered shall be primed prior to installation. ( .6 )
S rimary lnst er Date
I
Signature of Permit Holder
Date �
E