Loading...
1138.tif i RESIDENTIAL CODE 2009 IN TERNATI ONAL CITY OF BLAIR REROOFING CHECKOFF SHEET to Blair City all prior to Final Inspection , Retu � th y 21 8 S 16 Street, Blain NE 68 008 Because of limitations used b the infeasibility to *perform detailed inspections which would �mitattons ca y not interfere with reroofing work, please indicate compliance with the following requirements following , this reroofing job. Permit #: Installation Date. YES NO The materials and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (R907.1) IC E PR OTECTION INSTALLED: An ice barrier that consists of at least two layers of I� underla y meet or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed a to a point at least 24 inches inside the exterior wall line of the building. (R905.23.1) C� STRUCT URAL COMPONENTS ARE SOUND. The structural roof components are capable of supporting the roof covering system and the material and equipment loads • that will be encountered during installation of the roof covering system. (R907.2 EXISTING COVER ING WAS REMOVED: Existing rootcovering was removed for one • of the reasons required by section R907.3 USTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) PL ASHING INSTALLED PROPERLY; Plashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which 907 bituminous materials are to be adhered shall be primed prior to installation. ( .6 ) S rimary lnst er Date I Signature of Permit Holder Date � E