1132.tif I
f f
E
l
t
}
L O%ODE -
2009 INTERNATIONAL RESIDENTIA L;
CITY OF BLAIR REROOF
FF SHEET
Return to Blair City Hall'priorto Final Inspection
21 8 S 16 Street, Blair, NE 68008
Because of limitations caused b the infeasibility to *perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
permit #:
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
Q ICE PROTECTION
INSTALLED: An ice barrier that consists of at least two layers of
underla Y meet or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's ed a to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
J M STRUCTURAL C®MPONENTS ARE SOUND: The structural roof components are
coverin system and the material and equipment loads
. capable of supporting the roof g Y
that will be encountered during installation of the roof covering system. {R907.2}
E�CISTING COVE
RING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
ra :
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
' G INSTALLED PROPERLY: Plashing shall be reconstructed in accordance
FLASHIN
with approved a roved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6
Date
Signature of Primary Installer
E
h
Signature of Permit Holder Date