Loading...
1132.tif I f f E l t } L O%ODE - 2009 INTERNATIONAL RESIDENTIA L; CITY OF BLAIR REROOF FF SHEET Return to Blair City Hall'priorto Final Inspection 21 8 S 16 Street, Blair, NE 68008 Because of limitations caused b the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. permit #: Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) Q ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underla Y meet or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed a to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) J M STRUCTURAL C®MPONENTS ARE SOUND: The structural roof components are coverin system and the material and equipment loads . capable of supporting the roof g Y that will be encountered during installation of the roof covering system. {R907.2} E�CISTING COVE RING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ra : NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ' G INSTALLED PROPERLY: Plashing shall be reconstructed in accordance FLASHIN with approved a roved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6 Date Signature of Primary Installer E h Signature of Permit Holder Date