Loading...
1054 (2).tif 2 009 INTER NATIONAL � RESID C O DE c CITY OF BLAIR REROOFING CHECKOFF SHEEN' Return to Blair city Hall p to Fi Inspection , 21 8 S 16 Street, Blair, NB 68608 Because of limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Installation Date: t YE NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at (east from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL. GOMPONENTS ARE SOUND: The structural roof components are y capable of supporting the roof covering system and the material and equipment loads �r that will be encountered during installation of the roof covering system. (R907.2) EXIS VAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL ®R FLASHING*. Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing Were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bitumino s ate `al "re to be adhered shall be primed prior to installation. (8907.6} F c S' nature f r �in ler Date Date S i ature Holder i