CITY OF BLAIR REROOFING CHECKOFF SHEEN'
Return to Blair city Hall p to Fi Inspection ,
21 8 S 16 Street, Blair, NB 68608
Because of limitations caused by the infeasibility to *perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Installation Date:
t
YE NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at (east from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL. GOMPONENTS ARE SOUND: The structural roof components are
y
capable of supporting the roof covering system and the material and equipment loads
�r
that will be encountered during installation of the roof covering system. (R907.2)
EXIS VAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL ®R FLASHING*. Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing Were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bitumino s ate `al "re to be adhered shall be primed prior to installation. (8907.6}