CITY OF BLAIR REROOFING CHECKOFF SHEET
r
Return to Blair City Half prior to Final inspection
21 8 B 16 street, Blain NE 68008
i
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit
Installation Date.
YE NO
� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
� l
CE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed a
extends at least from the eaye's edge to a point at least 2� inches inside the extert r
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
stem and the material and equipment loads
s
capable of supporting the roof covering y
that will be encountered during installation of the roof covering system. (8907.2}
� EXISTIN
G COVERING WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section R907.3
Q NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROkRLY. Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bitu 'n s aterials to be adhered shall be primed prior to installation. (8907.6)
Si atu of Pri Installer Date
Date
Signature f e it older `