Loading...
1030.tif i 2009 INTERNAT RESIDE CITY OF BLAIR RER OOFING SHEET Blair Cit Hall'priorto Final inspection Return to � Q g 218 S 1 6 th Street, Blair, NE 680 Because of limitations caused b the infeasibility to *perform detailed inspections which would F not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing fob. Permit #: i Installation Date: ^ YES NO The materials and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (R907.1) I ICE PR OTECTION INSTALLED: An ice barrier that consists of at least two layers of � underla Y ment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's eft La to a point at Ieast 244 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are T capable of supporting the roof coverin g system stem and the material and equipment loads • that will be encountered during installation of the roof covering system. (R907.2) Exl STING COVERING WAS REMOVED: Existing roof'covering was removed for one � . of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) G FL SHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance C�. A � with approved manufacturer's installation instructions. Metal flashing t fi wh ich bitumino material e to be adhered shall be primed prior to installation. (R907.6) r Si re of Vrimary Ins alley Date Sig re of ermit Holder Date t • i