1030.tif i
2009 INTERNAT RESIDE
CITY OF BLAIR RER OOFING SHEET
Blair Cit Hall'priorto Final inspection
Return to � Q g
218 S 1 6 th Street, Blair, NE 680
Because of limitations caused b the infeasibility to *perform detailed inspections which would F
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing fob.
Permit #:
i
Installation Date: ^
YES NO
The materials and methods of application used for recovering or replacing the existing
�
roof covering comply with the requirements of the building code. (R907.1)
I
ICE PR OTECTION INSTALLED: An ice barrier that consists of at least two layers of
�
underla Y ment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's eft La to a point at Ieast 244 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
T
capable of supporting the roof coverin g system stem and the material and equipment loads
•
that will be encountered during installation of the roof covering system. (R907.2)
Exl
STING COVERING WAS REMOVED: Existing roof'covering was removed for one
� .
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
G
FL SHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
C�. A �
with approved manufacturer's installation instructions. Metal flashing t fi wh ich
bitumino material e to be adhered shall be primed prior to installation. (R907.6)
r
Si re of Vrimary Ins alley Date
Sig re of ermit Holder Date
t
• i