Loading...
1026.tif I CODE tt RESIDENTIAL ' 2009 CITY OF BLAIR REROOFING CHECKOFF SHEET Street, Blair, NE 684 R eturn to Blair city Half p rior to Fin Inspection , R th Y 6 . $ 21 8 S '16 Because of limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements f, ollowin this reroofing job. Permit #: I E Installation Date: YES NO � The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) E ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUGTURAL. GOIVIPONENTS ARE SOUND: The structural roof components are system and the material and equipment loads capable of supporting the roof cover y that will be encountered during installation of the roof covering system. (R907.2) , EXIS wAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 No RUSTED I1ETAL OR FLASHING: Existing vent flashing, metal edges, drain L? outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) d FL1a,SHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) i I 1 I Signatu of Pri r insta r Date x • r Date g Si nature ' Permit er