1026.tif I
CODE tt RESIDENTIAL '
2009
CITY OF BLAIR REROOFING CHECKOFF SHEET
Street, Blair, NE 684
R eturn to Blair city Half p rior to Fin Inspection ,
R th Y 6 . $
21 8 S '16
Because of limitations caused by the infeasibility to *perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
f, ollowin this reroofing job.
Permit #: I
E
Installation Date:
YES NO
� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1) E
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUGTURAL. GOIVIPONENTS ARE SOUND: The structural roof components are
system and the material and equipment loads
capable of supporting the roof cover y
that will be encountered during installation of the roof covering system. (R907.2) ,
EXIS wAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
No RUSTED I1ETAL OR FLASHING: Existing vent flashing, metal edges, drain
L? outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
d FL1a,SHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
i
I 1 I
Signatu of Pri r insta r Date
x
• r
Date
g
Si nature ' Permit er