907 (2).tif 2009 INTERNATIONAL RESIDEN
ROO ING CHECKOFF SHEET E
CITY OF BLAIR� 4
Return to Blair city Half prior to Fi inspection
F
218S16 th Street, Blair, NE 6800
Because of limitations cans y caused b the infeasibility to *perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements i
following this reroofing job.
Permit #: 1
I
Installation Date:
YE NO
The materials and methods of application used for recovering or replacing the existing
n
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underla Y ment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
building. wail line of g• R905.2.7.1)
[� STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2
EXISTING COVERING 111t'AS REMOVED. Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED I1i1ETAL OR FLASHING. Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signat of Primary Installer
Date
ig of Permit Holder f Date