906 (2).tif j
E
200 INTERNATIONAL RESIDENTIAL CO
CITY OF BLAIR RE
ROOFING CHECKOFF SHEET
Return to Blair city Half prior to Final Inspection
21 8 S 16 Street, Blain NE 68008
Y
Because of limitations
caused b the infeasibility to 'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followiffl this reroofing job.
Permit
Installation Date:
YE NO
� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of I
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the give's ed a to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and
the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXI
STING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
USTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
C� FLASH
1NG INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
p t v
Signat e of Primary Installer
Date
I
Date
Si nature of Permit Holder
j
i
i