CITY OF GLAIR RE ROOFING CHECKOFF SHEET
Return to Blair City Hall'plrlorto Final inspection
218 S '16 Street, Blain NB 68008
Because of limitations caused by the infeasibility to perform detailed inspections which woul
not interfere with reroofing work, please indicate compliance with the following requirem ents
following this reroofing job.
Permit # :.
Installation Date:
YE NO
� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
{� ICE PR
OTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's ed e to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
S RUCTURAL COMPONENTS ARE SOUND: The structural roof components are
T
capable of supporting the roof c overing system stem and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXIST
ING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in accordance
with approved manufacturer`s installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
p
Date
Signatu of Primary Installer E
L
Date
Wonature of Permit Holder