Loading...
678 (2).tif I I I I 0 09 INTERNATIONAL RESIDENTIAL CODE C ITY OF BLAIR R EROO FING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68068 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements I following this reroofing job. Permit installation Date: YE NO ❑ The materials and methods of application used for recovering or replacing the existing I roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wail line of the building. (R906,2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are " capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) S REMOVED: Existin ❑ EXISTING COVERING WAS g roof covering was removed for one of the reasons required by section R907.3 i z ❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) I y { t j ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminou aterials are to be adhered shall be primed prior to installation. (R907.6) 3 J � Signature of Prim ry Installer Dat'e 4 / ! t. I Date dig kure of Per it Ho der l i i i