0 09 INTERNATIONAL RESIDENTIAL CODE
C ITY OF BLAIR R EROO FING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68068
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements I
following this reroofing job.
Permit
installation Date:
YE NO
❑ The materials and methods of application used for recovering or replacing the existing
I
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wail line of the building. (R906,2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
" capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
S REMOVED: Existin
❑ EXISTING COVERING WAS g roof covering was removed for one
of the reasons required by section R907.3
i
z
❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
I
y { t
j ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminou aterials are to be adhered shall be primed prior to installation. (R907.6)
3
J
�
Signature of Prim ry Installer Dat'e
4 / ! t.
I
Date
dig kure of Per it Ho der