Loading...
645 (2).tif i i 2 009 INTERNATION RESIDENTIAL CODE - CITY OF B REROOFING CHECKOFF SHEET Return to Blair City Hall' prior to Final Inspection . 21 8 i 6 Street, Blair, NE 68008 3 infeasibility `led ecause of limitations caused by the to perform detailed inspections which would i p not interfere with reroofing work, please indicate compliance with the following requirements r e w g following this reroofing job. Permit #. P Installation Date: 71J 711 YES NO Th e materials and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) S RUCTURAL C�N[PONENTS ARE SOUND: The structural roof components are T cover system and the material and equipment loads capable of supporting the roof cov e ' ri ,..; that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING VAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 [� NO RUSTED C1i1ETAL OR FLASH[NGx Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) I� FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Sign a of Primary insta r Dat G Signature of Permit Holder Date i i