645 (2).tif i
i
2 009 INTERNATION RESIDENTIAL CODE -
CITY OF B REROOFING CHECKOFF SHEET
Return to Blair City Hall' prior to Final Inspection .
21 8 i 6 Street, Blair, NE 68008
3
infeasibility `led ecause of limitations caused by the to perform detailed inspections which would i p
not interfere with reroofing work, please indicate compliance with the following requirements
r e w g
following this reroofing job.
Permit #.
P
Installation Date: 71J 711
YES NO
Th e materials and methods of application used for recovering or replacing the existing
�
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
S RUCTURAL C�N[PONENTS ARE SOUND: The structural roof components are
T cover system and the material and equipment loads
capable of supporting the roof cov e ' ri
,..; that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING VAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
[� NO RUSTED C1i1ETAL OR FLASH[NGx Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
I� FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Sign a of Primary insta r Dat
G
Signature of Permit Holder Date
i
i