Loading...
643 (2).tif I S • i t 20®9 INTERNATIONA RESIDENTIAL CITY OF BLAIR RER OOFING CHECKOFF SHEEN" C ity Hall prior to Final Inspection Return to Blair th y p 218 S '16 Strew, Blair, NB 68008 Because of limitations Y 'o s caused b the infeasibility to •perform detailed inspections which would not interfere F ere with reroofing work, please indicate compliance with the following requirements following this reroofing job. ° t Permit #: Installation Date. YES NO The materials and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (R907.1) I� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underla Y ment or of a self - adhering polymer modified bitumen sheet was installed and extends of least from the eave's ewe to a point at least 24 inches inside the exterior k wall line of the building. (8905.2.7.1) Mr C1 STR UCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2 E�C1STl NG COVERING WAS REMOVED: Existing roof�covering was removed for one [� . of the reasons required by section R907.3 [� NO RUSTED Iv1ETAL OR FLASHINGx Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) SHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing toc 8907.6 bituminous material"re to be adhered shall be primed prior to installation. ( ) • Sign a of Primary lnsta r Date r Signature of Permit Holder Date k