643 (2).tif I
S
• i
t
20®9 INTERNATIONA RESIDENTIAL
CITY OF BLAIR RER OOFING CHECKOFF SHEEN"
C ity Hall prior to Final Inspection
Return to Blair th y p
218 S '16 Strew, Blair, NB 68008
Because of limitations Y
'o s caused b the infeasibility to •perform detailed inspections which would
not interfere
F
ere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
° t
Permit #:
Installation Date.
YES NO
The materials and methods of application used for recovering or replacing the existing
�
roof covering comply with the requirements of the building code. (R907.1)
I�
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underla Y ment or of a self - adhering polymer modified bitumen sheet was installed and
extends of least from the eave's ewe to a point at least 24 inches inside the exterior
k
wall line of the building. (8905.2.7.1)
Mr C1 STR
UCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2
E�C1STl NG COVERING WAS REMOVED: Existing roof�covering was removed for one
[� .
of the reasons required by section R907.3
[� NO RUSTED Iv1ETAL OR FLASHINGx Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
SHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing toc 8907.6
bituminous material"re to be adhered shall be primed prior to installation. ( )
•
Sign a of Primary lnsta r Date
r
Signature of Permit Holder Date
k