Loading...
642 (2).tif I i 2009 INT E RNATIONAL RE SIDENTIAL CHECK C QTY O F B LAl R REROOFING SHEET R eturn to Blair City Hall'prior to Final Inspection , 218x'16 th Street, Blair, HB 6 , Because of limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: Installation Date: YES NO � The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof cov ering y erin system and the material and equipment loads that well be encountered during installation of the roof covering system. (R907.2) E XISTING COVERING y11'AS REMOVED: Existing roof'covering was removed for one C� E . of the reasons required by section R907.3 (� IVO RUSTED IVIETAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING 1NS`rALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Date E Signatu f Primary Installer I f Signature o Permit Holder Date ! i