642 (2).tif I
i
2009 INT E RNATIONAL RE SIDENTIAL
CHECK C QTY O F B LAl R REROOFING SHEET
R eturn to Blair City Hall'prior to Final Inspection ,
218x'16 th Street, Blair, HB 6 ,
Because of limitations caused by the infeasibility to *perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #:
Installation Date:
YES NO
� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof cov ering y
erin system and the material and equipment loads
that well be encountered during installation of the roof covering system. (R907.2)
E XISTING COVERING y11'AS REMOVED: Existing roof'covering was removed for one
C� E .
of the reasons required by section R907.3
(� IVO RUSTED IVIETAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING 1NS`rALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Date E
Signatu f Primary Installer I
f
Signature o Permit Holder Date !
i