Loading...
617 (2).tif f • E j 2009 INTERNATIO RESIDENT CITY O RE ROOFING CHECKOFF SHEET F Return to Blair City Hallpriorto Final inspection , th Blair NB 68008 2� 8 S � 6 Street, Because of limitations caused b the infeasibility to 'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: Installation Date: YES NO materials and methods of application used for recovering or replacing the existing The mat e � rt roof covering comply with the requirements of the building code. (R907.1) L� ICE PROTECTI ON INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and ext at least from the eave's ed e to a point at least 24 inches inside the exterior wail line of the building. (R905.2.7.1) STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are y capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) 1 =XlSTI NG COVERING WA REMOVED: Existing roof'covering was removed for one � , of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.6) ASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) , i Signature of Primary Installer Date . q P Si of Permit Holder Date i