Because of limitations caused by the infeasibility to'perform detailed inspections which woul
not interfere with reroofing work, please indicate compliance with the following requirem
following this reroofing job.
Permit #: /
Installation Date: !
YES NO
The materials and methods of application used for recovering or replacing the existing
� ri
roof covering comply with the requirements of the building code. (R907.1)
I� IC E P
ROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a paint at least 2� inches inside the exterior
wall line of the building, (R905.2.1.1)
S RUGTURAL. GONIPONENTS ARE SOUND: The structural roof components are
T
capable of supporting the roof cov ering system stem and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
(� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
(� NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
SHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance
(�
FLA
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8.907. 6