Loading...
616 (2).tif I ' f 2009 INTERN ATIONAL RES I DENTIA.L� CODE CITY OF BLAIR RE ROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection , 21 5 S W Street, Blain NE 65608 i Because of limitations caused by the infeasibility to'perform detailed inspections which woul not interfere with reroofing work, please indicate compliance with the following requirem following this reroofing job. Permit #: / Installation Date: ! YES NO The materials and methods of application used for recovering or replacing the existing � ri roof covering comply with the requirements of the building code. (R907.1) I� IC E P ROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a paint at least 2� inches inside the exterior wall line of the building, (R905.2.1.1) S RUGTURAL. GONIPONENTS ARE SOUND: The structural roof components are T capable of supporting the roof cov ering system stem and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) (� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 (� NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) SHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance (� FLA with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8.907. 6 v?/ Z- I Sign re of Primary In alter Dat i ature of Permit Holder Date Sign r k G i f