Loading...
615 (2).tif 200 INTERNATIONAL RESIDENTIAL, CO D - CITY OF BLAIR R CHECKOFF SHEET urn to Blair Cit Mall prior to final Inspection , R.et th � 008 ' 21 g S � i 6 Street, Blain, NB 68 Because of Imitations Y caused b the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following, this reroofing job. Permit Installation Date. L9/42Z-5 YES NO The mater ials and methods of application used for recovering or replacing the existing (� roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaye's ed e to a point the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are Y capable of supporting the roof coveri system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) E�CISTI NG COVERING WA REMOVE ©: Existing roof'covering was removed for one [� , of the reasons required by section R907.3 NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) PLASHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance with approved manufacturer`s installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Primary Installer Date f Dat Sig of Permit Holder ' i r i