Loading...
606 (2).tif i I r E JUI. 29. 2014 11, 57AM ADC Homes NO. 8191 P. 3 2009 INTERNATIONAL RESIDENTIAL CODE - ROOFING CHECKOFF SHEET CITY OF BLAIR RE I l f Return flair city Hall rior Final hisP ootion 218 S 16 street Blair, NE 680 »ecause o f lirijlta. Lions caused by the i to'perforrn detailed Inspections which would not intellaro with reroofirlg work, please indicate rompllanco with the following requ iremOnt fo lowin this reroofing job., Permit 01. A + u Installation Dat% YN6 NO The materials aild methods of application used for recovering or replaaln� tl�e existing roof covering comply with the requirements of the building code (11907, } iCE PPQTEQTi0 -- 1NS --ALL a: An Ice barrier that o n lsts fat least tvva lte and underlayment or of a self-adhering polymer modified bitumen sheet was i a tends at least from the eave's ed a to a point at bast �� inches inside tl�e e erior wall line of the building, (8905.2.7.1) STRUCTURAL AL CC MpONLI�ITS ARE S01d�l�t: The stru�ti��l roof co7npQnee I��ds capable of supporting the roof covering a nd the mate and equipme that will be enooLintered during installation of the roof covering system, ( R907-2) EXISTING C OVERING . W 1 MOVED: Existing roof covering Was removed for one of the reasons required by section 1,907.3 OR FLASHING, Existing vent flashing, metal edge in outlets, collars or metal counter- fla -shing were not reinstalled if rusted. (R W l-ll�i lid Z"A�,t.E> FI tOFEF I�`�: Mashing shall be reconstructed in accordance LA with approved manufaoturer's installation instructions. Meta f t I latin� (R�07.5} blturninoi.ts rnaterials are to be adhered shall n ll be pred pri or - 7— 4 1 SIgn re Fr ma Installer Late I Sig&reP ol der Date f