606 (2).tif i
I
r
E
JUI. 29. 2014 11, 57AM ADC Homes NO. 8191 P. 3
2009 INTERNATIONAL RESIDENTIAL CODE -
ROOFING CHECKOFF SHEET
CITY OF BLAIR RE
I
l
f
Return flair city Hall rior Final hisP ootion
218 S 16 street Blair, NE 680
»ecause o f lirijlta.
Lions caused by the i to'perforrn detailed Inspections which would
not intellaro with reroofirlg work, please indicate rompllanco with the following requ iremOnt
fo lowin this reroofing job.,
Permit 01.
A + u
Installation
Dat%
YN6 NO
The materials aild methods of application used for recovering or replaaln� tl�e existing
roof covering comply with the requirements of the building code (11907, }
iCE PPQTEQTi0 -- 1NS --ALL a: An Ice barrier that o n lsts fat least tvva lte and
underlayment or of a self-adhering polymer modified bitumen sheet was i
a tends at least from the eave's ed a to a point at bast �� inches inside tl�e e erior
wall line of the building, (8905.2.7.1)
STRUCTURAL AL CC MpONLI�ITS ARE S01d�l�t: The stru�ti��l roof co7npQnee I��ds
capable of supporting the roof covering
a nd the mate and equipme
that will be enooLintered during installation of the roof covering system, ( R907-2)
EXISTING C OVERING . W 1 MOVED: Existing roof covering Was removed for one
of the reasons required by section 1,907.3
OR FLASHING, Existing vent flashing, metal edge in
outlets, collars or metal counter- fla -shing were not reinstalled if rusted. (R
W
l-ll�i lid Z"A�,t.E> FI tOFEF I�`�: Mashing shall be reconstructed in accordance
LA
with approved manufaoturer's installation instructions. Meta f t I latin� (R�07.5}
blturninoi.ts rnaterials are to be adhered shall n
ll be pred pri or
- 7— 4 1
SIgn re Fr ma Installer Late
I
Sig&reP ol der
Date
f