585 (2).tif l
I
i
i
REROOF 2009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF BLAIR H+ SHEET r
Return to Blair city Hall prior to Final inspection
6' Street, Blair, NE 6800
e of isnnl'taticr�s
becaus
aused by the infeasibili to detailed inspections which would
not interfere with reroofing work, please indicate oomplia nco w ith the following requireMen �
f to lawi Phis reroofing Job. 005`�65
Pe r mit O«
installation Date. .
YE'S N
The materials and methods of application used far recovering or replacing the existing
roar covering comp ( with the requirements of the building code. (RW7. )
i
Y
T c�`loM ll� TALI EM An ice barrier that consists of at least two layer �
underlayment or of a self-adhering polymer modified bitumen derthaaelxterlot-
extends at leasf frorry the 's11eve ed a to a point at least 2 in s
wall line of the building. (R!UU5.2.7.'i)
TUR col�ll'ONENTS ARE SOUND: The structural roof COMPanents are
�
TR stem and the material and equipment load
capable' 6f supporting the roof covering ey
that Will be encountered during Installation of the roof covering system, 1�907.� )
WAS R,EMOVl D: Existing roof covering was removed for one
of the reasons req uired ��tl�TiN� cQ�� lei rid b section Rg07.Q
HtUT
L OR FLASHIi�G' FYIsting gent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted, (H907,6)
❑,
FLASHING )NIST�AL�ED €��OP_RLY-. Flashing shall be reconstruote whichorctance
with apprcued manufacturer's installation rnstru�an�. Metal flashing
all
bit uminous materials are to be adhered sh lie primed prior to installation R,g07. )
"qigna er of ri rY nstall r
Fate
G
pate
nature Permit bolder
j
i
C