Loading...
584 (2).tif i I I I 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF LAIR REROOFING CHECKOFF SHEET urn dal pity Half prior to Final inspection 2 18 S i 6tn street, Blain, NE 68008 13e0a.use of limitations caused by the infeasibilitY to'perform de'lailed A"Spections which would not Interfere with reroofing work, please indloate compliance with the f011owing requirements following this reroofing job. Permit 0. Installation Date: VrQ NO The materials and methods of application used for recovering or r eplacing the existing roof covering Comply with the requirements of the building code. (R907.1) i ICE PROTECTION INSTALLED A Joe barrier that consists of at least two layers n d underiayrnent or Of a elf -adherin polymer modified bitumen sheet was tnstalle . extends at least From the eaye's edge to a point a# ieest inches inside the exterior wall line of the building. F908.23 -`!) STR coMPONFNTS ARC S0UND: The struotural roof components a ` capable of supporting the roof covering system and the material and equipment l oads that will be encountered during Installatiori of the roof covering system. (R007,2) Dt V1=Rl 4Q WAS REMOVED: F xisting roof covering was removed for one E of'the reasons rewired by section 8907.3 R T t1tIETAL OR FLASHING: Existing vent fleshing, mewl edges, drain outlets, callers or metal counter-flashing were not reinstalled if rusted. (R907.5) I ( (� p�ASHIN G INSTALLED PROPERLY: dashing shall be reconstructed In accordance �ritl� approv�:d rnanu�acturer's installation instructions. Metal f lashin g I to installation. (R907.6) bituminous materials are to be adhered shall its primed prior to ins -§;gnat a of ri Install r Date r tW e Permit Ho Date i i