2009 INTERNATIONAL RESIDENTIAL CODE CITY OF LAIR REROOFING CHECKOFF SHEET
urn dal pity Half prior to Final inspection
2 18 S i 6tn street, Blain, NE 68008
13e0a.use of
limitations caused by the infeasibilitY to'perform de'lailed A"Spections which would
not Interfere with reroofing work, please indloate compliance with the f011owing requirements
following this reroofing job.
Permit 0.
Installation Date:
VrQ NO
The materials and methods of application used for recovering or r eplacing the existing
roof covering Comply with the requirements of the building code. (R907.1)
i
ICE PROTECTION INSTALLED A Joe barrier that consists of at least two layers n d
underiayrnent or Of a
elf -adherin polymer modified bitumen sheet was tnstalle .
extends at least From the eaye's edge to a point a# ieest inches inside the exterior
wall line of the building. F908.23 -`!)
STR coMPONFNTS ARC S0UND: The struotural roof components a
`
capable of supporting the roof covering system and the material and equipment l oads
that will be encountered during Installatiori of the roof covering system. (R007,2)
Dt V1=Rl 4Q WAS REMOVED: F xisting roof covering was removed for one E
of'the reasons rewired by section 8907.3
R T t1tIETAL OR FLASHING: Existing vent fleshing, mewl edges, drain
outlets, callers or metal counter-flashing were not reinstalled if rusted. (R907.5)
I
( (� p�ASHIN
G INSTALLED PROPERLY: dashing shall be reconstructed In accordance
�ritl� approv�:d rnanu�acturer's
installation instructions. Metal f lashin g I to installation. (R907.6)
bituminous materials are to be adhered shall its primed prior to ins
-§;gnat a of ri Install r Date