Loading...
460 (2).tif l � 1 j _.. i Jul. 29. 2014 10:53AM No. 7988 P. I 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to SlaIr CI* Hall prior to Final Inspection 2188-16 1h Xreet, Blair, NE 68008 Because of limitations used by the liffeaellbilKy to perfonn detailed inspeotione which would not into re with reroofing work pleasi Indicate complianco with the following requirements JM this reroofing job. Permit M Installation Date: Y The materials and methods 9f application used for recovering or replacing the existing roof covering comply with th4 requirements of the building code. (119071) ICF PRQTECTION INST An lea barrier that consists of at l6aSt WO lagers Of underlaymont, or of a self adhering po"r modified bitumen sheet mMingdallA and extends a !a 0 erior at OAWA-009 to a point at legal 24 Inches Insid th ext wall line of the Wilding. (R9Qft2.7.i) e%R ARE§gUND: The structural roof compoMhtg M capable of supporting the ro ' covering system and the material and equipmont loads that VAll be sneounteW d2nig Installation of the roof hovering system. (11807.2) EXISTING COVERING WA i RgffQ=, Existing roof covering was removed for one of the reasons required by 860tiOn R907-3 NO RUPTED METAL OR F LSHjffl; Existing vent flashing, metal edges, drain outlets, collars or metal coull ,,�Wr-flashing were not reinstalled if rusted, (R907.8) FLASHING INSTALLED PiWprzRLY-. Flashing shall be reconstructed In accordance with approved manufactu e " Instructions. Metal flashing to which o toP adhered shall be primed prior to installation. (R907.6) 1 /287M IT Signature ry In Date # au Date 9*iii Si f6r of ermft Hold