402 (3).tif I
Jul 31 1412;28p Prestige Construction Inc 402 932 0373 p.1
Cr%DE
2009INTERNAIIONALrm%ESIDEONOTIA-L- u
i
' f
RERO HEM
C ITY LAIR t
R to flair City Hail prior to Final inspection
218 S 16tn Street, Blair, NE 68808
i
infeasibility to per
Because of
limitations caused by the form detailed inspection re ui em n�s
not interfere with reroofing work, please indicate compliance with the �followi g q
llowin this reroofing job.
Permit #.
Installation Date:
YES No
� The materials and methods of application used for recovering or replacing the existing
` roof cowering comply with the requirements of the building code. (R907A)
ICl~ PROTECTIOI�i INSTALLED: An ice barrier that consists of at least hvo layers of
al rner m odified bitumen sheet w installed and
underlayment or of aself- adhering p Y
extends at least from the eaveis ed e to a point at least 24 inches inside the exterior
wall line of the building. (R905 are
l and q :STRUCTURAL :STRUCTURAL COIVIPONENTS ARE SOUND. The strut materia#ural roof toe p� p mans loads
} capable of supporting the roof covering sy stem and the
that will be encountered during installation of the roof covering sy stem. (R907,2)
O COVERING WAS REMOVED; Existing roof covering was removed for one
� E)[ISTiN. '
of tine reasons required by section R907,3
l++iC} RUSTED iIETAL. OR FLASHING= Existing vent flashing, metal edges, drain
-- shin were not reinstalled if rusted. {R907.}
outlets collars or metal counter -flashing g
�
J Uf,.✓ j v`
{ r
FLASHING INSTALLED pR{JPERLY: Flashing shall be reconstructed in accordance
installation Instructions. Instructions. Metal flashing to which
with approved manufacturer s
r: it_urninous materials are to be adhered Shall be primed prior to installation. (8907.6)
b _.
Date
Signature pftPrimary Insfa
H41de� �..... bate
?.gMture of P6rmit