Loading...
402 (3).tif I Jul 31 1412;28p Prestige Construction Inc 402 932 0373 p.1 Cr%DE 2009INTERNAIIONALrm%ESIDEONOTIA-L- u i ' f RERO HEM C ITY LAIR t R to flair City Hail prior to Final inspection 218 S 16tn Street, Blair, NE 68808 i infeasibility to per Because of limitations caused by the form detailed inspection re ui em n�s not interfere with reroofing work, please indicate compliance with the �followi g q llowin this reroofing job. Permit #. Installation Date: YES No � The materials and methods of application used for recovering or replacing the existing ` roof cowering comply with the requirements of the building code. (R907A) ICl~ PROTECTIOI�i INSTALLED: An ice barrier that consists of at least hvo layers of al rner m odified bitumen sheet w installed and underlayment or of aself- adhering p Y extends at least from the eaveis ed e to a point at least 24 inches inside the exterior wall line of the building. (R905 are l and q :STRUCTURAL :STRUCTURAL COIVIPONENTS ARE SOUND. The strut materia#ural roof toe p� p mans loads } capable of supporting the roof covering sy stem and the that will be encountered during installation of the roof covering sy stem. (R907,2) O COVERING WAS REMOVED; Existing roof covering was removed for one � E)[ISTiN. ' of tine reasons required by section R907,3 l++iC} RUSTED iIETAL. OR FLASHING= Existing vent flashing, metal edges, drain -- shin were not reinstalled if rusted. {R907.} outlets collars or metal counter -flashing g � J Uf,.✓ j v` { r FLASHING INSTALLED pR{JPERLY: Flashing shall be reconstructed in accordance installation Instructions. Instructions. Metal flashing to which with approved manufacturer s r: it_urninous materials are to be adhered Shall be primed prior to installation. (8907.6) b _. Date Signature pftPrimary Insfa H41de� �..... bate ?.gMture of P6rmit