Loading...
324.tif _ r 2 009 INT E RNA TIONAL CITY OF BLAIR REROOFING CHECKOFF SHEEN' Return to Blair City Hall' prior to Final inspection . 21 8 S '16 Street, Blair, NE 68008 f Because o limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #. Installation Date: YES NO Th e materials and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (R907.1) • 4 4 4 [ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's ed e to a point at least 24 inches inside the exterior wail line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are system and the material and equipment loads capable of supporting the roof cover rin g y that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one i of the reasons required by section R907.3 [� 110 RUSTE D METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of P ' ary Ins Date • t Date Signature of Permit Holder c i