324.tif _ r
2 009 INT E RNA TIONAL
CITY OF BLAIR REROOFING CHECKOFF SHEEN'
Return to Blair City Hall' prior to Final inspection .
21 8 S '16 Street, Blair, NE 68008
f
Because o limitations caused by the infeasibility to *perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #.
Installation Date:
YES NO
Th e materials and methods of application used for recovering or replacing the existing
�
roof covering comply with the requirements of the building code. (R907.1)
• 4
4
4
[ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's ed e to a point at least 24 inches inside the exterior
wail line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
system and the material and equipment loads
capable of supporting the roof cover rin g y
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
i
of the reasons required by section R907.3
[� 110 RUSTE
D METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature of P ' ary Ins Date
• t
Date
Signature of Permit Holder
c
i