Loading...
678_0001.tif s i N INTERNATIONA RESIDENTI C ITY OF BLAIR REROOFING H F SHEET E Return to Blair City Hall prior to Final inspection 218 S 'l6 Street, Blair, NE 68008 infeasibility to perform detailed inspections which would C Because of limitations caused by the mfeas� y p not Interfere with reroofing work, please indicate compliance with the following requirements folio win this reroofing job. Permit #: 6 I Installation Date: YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8.905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are i capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) G Signature of Primary Installer ate Si n ture of Per it Ho de D to g, PRINTED: 07/09/14 07:07:26 CUSTOMER COPY -I i i