678_0001.tif s
i
N INTERNATIONA RESIDENTI
C ITY OF BLAIR REROOFING H F SHEET
E
Return to Blair City Hall prior to Final inspection
218 S 'l6 Street, Blair, NE 68008
infeasibility to perform detailed inspections which would C
Because of limitations caused by the mfeas� y p
not Interfere with reroofing work, please indicate compliance with the following requirements
folio win this reroofing job.
Permit #: 6 I
Installation Date:
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8.905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
i capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
G
Signature of Primary Installer
ate
Si n ture of Per it Ho de D to
g,
PRINTED: 07/09/14 07:07:26
CUSTOMER COPY -I
i
i