1270_0001.tif 2009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall* prior to Final inspection
218 S 16th street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job. - 7
Permit o c,-,� 3 f
Installation Date:,
YES NO
The materials and method s o f a pplication used for recovering or replacing the existing
roof covering co mply with the requirements of the building code. (R907.1)
layers ICE PROTECTION INSTALLED. An ice barrier that consists of at least tw o lay s of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave!g d a to a point at least 24 inches inside the exterior
,
wall line of the building. (8905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXl
STING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, m etal edges, drain
ou tlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
INSTA PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's inst allation i Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature of Primary Installer Date
Si
Date
nat
ure of P it Holder