2338_0001.tif 2009 INTERNATIONAL RESIDENTIAL CODE -
CITY O F B LAl R RE
ROOFING CHECKOFF SHEET
Return to Blair city Hall'prior to Final Inspection
218 S'16th Street, Blair, HE 6800
B of limitations caused by the infeasibility to 'perform detailed i which would
not interfere with reroofing work, please indicate compliance with the following r e q uirements
following this reroofing job.
e- —,2
Permit
Installation Date:
YES NO
The materials and methods of application used for recovering o replacing the existing
roof covering com with the requirements of the building code. (R907.1)
ICE P ROTECTIO ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
lL the ea
extends at leas to a point at least 244 inches inside the exterior
--- edge —d-g
wall line of the building. (R905-2.1-1)
)NENTS ARE SOUND: . The structural roof components are
[�C� ST R
capable of supporting the r oof covering system and the material and equipment loads
that will be enc ou during installation of the roof covering system. (R907.2)
EXISTING COVERING INAS REMOVED; Existing r oof covering was r emoved for one
of the reasons required by section R907.3
No RUSTED METAL OR FLASHI Existing vent flashing, m etal edges, drain
ou tlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.6)
FL p PROPERLY: Flas
hing shall be reconstructed in accordance
......
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
el —
Signature of FTimary Installer Date
Signature of Permit Holder Date