Loading...
2338_0001.tif 2009 INTERNATIONAL RESIDENTIAL CODE - CITY O F B LAl R RE ROOFING CHECKOFF SHEET Return to Blair city Hall'prior to Final Inspection 218 S'16th Street, Blair, HE 6800 B of limitations caused by the infeasibility to 'perform detailed i which would not interfere with reroofing work, please indicate compliance with the following r e q uirements following this reroofing job. e- —,2 Permit Installation Date: YES NO The materials and methods of application used for recovering o replacing the existing roof covering com with the requirements of the building code. (R907.1) ICE P ROTECTIO ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and lL the ea extends at leas to a point at least 244 inches inside the exterior --- edge —d-g wall line of the building. (R905-2.1-1) )NENTS ARE SOUND: . The structural roof components are [�C� ST R capable of supporting the r oof covering system and the material and equipment loads that will be enc ou during installation of the roof covering system. (R907.2) EXISTING COVERING INAS REMOVED; Existing r oof covering was r emoved for one of the reasons required by section R907.3 No RUSTED METAL OR FLASHI Existing vent flashing, m etal edges, drain ou tlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.6) FL p PROPERLY: Flas hing shall be reconstructed in accordance ...... with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) el — Signature of FTimary Installer Date Signature of Permit Holder Date